Handling at Ukraine – Poland border crossings*
A total of 1,400 wagons including 229 wagons with sunflower oil, 278 wagons with cakes, 345 wagons with ore and 103 wagons with metals were moving to the Izov station on August 30.
A total of 1,400 wagons including 229 wagons with sunflower oil, 278 wagons with cakes, 345 wagons with ore and 103 wagons with metals were moving to the Izov station on August 30.
About 321 wagons were transferred daily through the Chop – Čierna nad Tisou land border crossing point from August 1 to August 31 (up 15 wagons compared with the period from August 1 to August 24). In particular, 285 wagons were moving on export routes (up 18 units)
As many as 601 wagons were heading to the Batiovo – Epereshke land border crossing point on August 28, of which 194 wagons were loaded with grain and 166 wagons with vegetable oil. Up to 57 wagons including 55 wagons with grain were moving to the Chop – Zahony border crossing.
As many as 562 wagons were heading to the Batiovo – Epereshke land border crossing point on August 21, of which 182 wagons were loaded with grain, 105 wagons with vegetable oil, and 16 wagons with cakes.
As many as 287 wagons were transferred daily through the Chop – Čierna nad Tisou land border crossing point from August 1 to August 17 (up 11 wagons compared with the period from August 1 to August 10).
A total of 1,302 wagons were waiting in a queue at the Izov station on August 1-16, while 1,219 wagons were standing at the Mostyska-2 station and 400 wagons at the Yahodyn station (170 units with grain, 59 units with clay, 66 units with cement, and 33 containers).
The active phase of construction of an 8-hectare multimodal terminal in the Georgian port of Poti will begin in September this year. The first phase is expected to be commissioned in Q1 2024. The throughput capacity at this stage will be about 80,000 TEU per year, and the total maximum design capacity will be…… Read more »